PROJECT

Tool Install Design

Sector

Semiconductor

Location

Leixlip

Value

N/A

Duration

2020 – Present

Sector

Semiconductor ​

Customer

Confidential

Total

CONFIDENTIAL

What we did

The BMD BIM team has produced over 100,000 IFC isometric drawings to date, developing detailed fabrication and installation drawings for pipework, structural supports, and carrier systems. Extensive 3D model coordination was carried out with multiple specialty contractors to ensure seamless integration and precision across all disciplines.

Engineer inspecting refinery plans on industrial site
left-shape
track track track track