PROJECT
Boiler Chiller Plant (BCP) Project
Sector
Semiconductor
Location
Co. Kildare
Value
€ 42M
Delivering Precision-Engineered Cooling Infrastructure for Advanced Manufacturing
Duration
18 Months
Sector
Semiconductor
Customer
Confidential
Total
€42M
Project Details
Design, rigging, and installation of complex cooling and chiller systems to expand Intel’s production capability.
What We Did
Delivered full mechanical and process design from LOD200 to LOD400, converting the Revit model to a complete 3D plant design.
Managed the rigging and installation of 36 cooling towers, 16 chillers, 32 pump skids, and 11 vessels.
Fabricated and installed 12,400 metres of pipework ranging from 12mm to 750mm diameter.
Completed 244,000 weld inches, with 92% of all welding executed offsite through BMD’s OSM facilities.
Oversaw full testing, commissioning, and project handover to client specifications.