Project Details

: IDL Boiler​ Composite Manufacturing Facility Project

What We Did

  • New boiler house converted from an existing warehouse on site to support increased capacity for the plants new extension.
  • Installation of boiler house equipment and approx. 3,500 LinM of associated large and small bore pipework of carbon and stainless steel on existing racks within the plant and on new racks within the boiler house.
  • BMD worked in conjunction with the structural steel company on the piperack build and insulation of all pipework and equipment was also included in the workscope.