|
Pfizer, Ringaskiddy - Modular Solvent Recovery Unit
BMD were responsible for the off-site construction of a new modular solvent recovery unit to be used for the recovery of a range of solvents at Pfizer’s Ringaskiddy site. This project included Skid-mounted distillation equipment including storage vessels for feed stocks and recovered solvents.
Value: €4M
|
|
GlaxoSmithKline, Currabinny, Co. Cork - Topetecan Module Project
Complete Mechanical, HVAC, Civil, Structural and Electrical Installation of 6 Modules (gross floor area of 3000 sq ft, module weight of 80T), constructed offsite at BMD’s workshop facility in Cork Dockyard and shipped via barge for final transfer and erection at GSK’s plant in Currabinny, Carrigaline, Co. Cork. The project was completed within 8 months.
Value: €2.3M (2006) |
|
Fournier Laboratories, Carrigtwohill,
Co. Cork
Extension to the existing plant incorporating a new
tablet manufacturing suite and plant room.
Project: Extension and Modifications
to existing plant
Highlights: Process Mechanical and Mechanical
Building Services Installation
Installation and Hook Up of process equipment associated
with the project
Value: €2M (2005) |
|
Wyeth Medica Ireland, Grangecastle,
Co. Dublin
Project: Drug Substance Building
Highlights:
62,000m of piping (24,000m of high purity piping)
Fast Track Alliance Contract
Value: €55M (2004) |
|
Pfizer Ireland Pharmaceuticals, Ringaskiddy,
Co. Cork
Project: OSP4 Production Facility
Highlights:
54,000m of piping
500 tonnes of process equipment
Value: €26M (2001) |
|
Takeda Pharma Ireland, Grangecastle,
Co. Dublin
Project: Active Pharmaceutical
Ingredient Plant
Highlights:
Offsite fabrication of 19 Pre-Assembled Piperacks
for API Plant
10,000m of process and utility piping |
|
Eli Lilly S.A Branch, Kinsale, Co.
Cork
WINNER OF CONSTRUCTION EXCELLENCE AWARDS
2001 IN SPECIALIST CATEGORY - 1ST PRIZE
Project: IE16 Production Facility
Highlights:
Constructed in module form offsite
Site erection in 21 days
|
|
Janssen Pharmaceuticals (Ire) Ltd,
Little Island, Co. Cork
Project: P3 API Production Facility
Highlights:
12,000m of process and utility piping
Complete Mechanical Installation
|
|
Bristol Myers Squibb, Swords, Co.
Dublin
Project: New Solvent Recovery Tower
Highlights:
Process Modules for New Solvent Recovery Tower and
Piperack Installations |
|
Schering Plough (Brinny), Inishannon,
Co. Cork
Project: Fermentation Building 18
- Contingency Fermentor (Current)
Other Projects :
OPS 1 Posaconazole lV Project
OPS 1 CGMP Upgrade Project
OPS 2 Optimisation Project |
|